I had this idea in the discord channel, but let’s flesh the standard out a bit in this thread. https://discordapp.com/channels/1030207681052557322/1343750277982846996/1347935020412571780
@laura – we certainly on for a fall trolley display? That’s where I’m thinking this will play a role.
LUG will provide the green 2×4 bricks to serve as the ‘grid’ around the grave sites. additional tree decor and such welcome. if we have enough entries, maybe we’ll even have a build day for it, building a road through it and other scenes and such.
The idea is that a plot is a 6×10 stud area. they’ll be divided in a grid with a 2 stud gap all around, meaning, if you want to do a side by side plot (think husband and wife) it will be a 14×10 plot (2×6+2 inner grid), or if you wanted to do a family of 4 / millionaire taking a 2×2 plot to be buried with his ‘84 corvette, it will be 14×22. got it?
if you want to just throw down a tomb stone, think 2×4 base. Maybe we can get a bunch of these from the lug funds in a blank style (like those 1×4 double bows on top of 2-3 1×4 bricks, etc.