CSC Locomotion Weekend – 1/14/23 – 1/15/23

Home Forums LUG discussions CSC Locomotion Weekend – 1/14/23 – 1/15/23

Tagged: ,

Viewing 25 posts - 101 through 125 (of 181 total)
  • Author
    Posts
  • #49493
    Glenn Holland
    Participant

    @emperorofthenorthpole – do you want me to send up one of those tiny bluetooth speakers to put in/on a train for “choo choo noises” fun?

    That’s alright, I don’t have anything I can use them in/on currently.

    #49495
    Tim
    Moderator

    As stated in the “MILS Build Day – Saturday Jan 7” thread, we got a lot done this weekend. It looks like @rcgrier3406 and I are the only ones currently planning to do set up on Friday (of course, anyone else is very welcome to join us).

    On Friday, our set up plan will be to get all of the MILS plates and track laid down, electricity supply set up, and test the 9v track to make sure it is working properly. On Saturday morning, we can then set up all the scenery. We have a few buildings, minifigs, etc. from Josh/LUG supply. I am planning on bringing trees/landscaping. Is anyone else planning on supplying scenery/buildings/etc.?

    #49500
    John S
    Participant

    Been somewhat following the thread. If you need buildings I have a “winterized” Main St, 5-6 baseplate long with a road that now runs a modified version of the trolley that came out recently. It uses pybricks to run the trolley line end to end with a stop in the middle so has some action to the scene.

    Total footprint would be 2 x 5-6 baseplates if you have room or interested.

    I’m late to the party so it’s no problem if no space is available. Figured I’d at least offer though. Thanks.

    #49503
    Greg Schubert
    Participant

    Been somewhat following the thread. If you need buildings I have a “winterized” Main St, 5-6 baseplate long with a road that now runs a modified version of the trolley that came out recently. It uses pybricks to run the trolley line end to end with a stop in the middle so has some action to the scene.


    @amplef0rth
    Please post some photos or a video. I would love to see what you created. 🙂

    #49505
    Bob Grier
    Participant

    As @joshhall mentioned, we’ve decided to modify the layout somewhat based on what we got done on Saturday, and what @pnbrenem has so graciously loaned us to use for this event. I spent some time this morning making this rough “cut and paste” version to show the changes. Not pretty, but functional.


    @timf
    , I put the (3) 9v loops in where I knew they would fit and didn’t try to necessarily butt up against the baseplates for the long radius curve corners. We can adjust as we see fit during set-up on Friday. I also put Phil’s turnouts in the “rail yard” area just to see how they would fit. Again, we can decide during set-up whether to use them or just lay straight rail sections down that aren’t connected to the outer loop track. I’m pretty sure we have enough of Phil’s track to do this, but I’ll try to do a count this afternoon to make sure.


    @amplef0rth
    , we have a spot in the middle of the inner 9v double track that’s 5 baseplates wide by 2 deep that looks perfect for your Main St.! If you need wider that 5 baseplates, we might be able to accommodate that as long as we go in 5″ (16 studs, single track section) increments. Let me know.

    • This reply was modified 1 year, 10 months ago by Bob Grier.
    Attachments:
    You must be logged in to view attached files.
    #49508
    John S
    Participant

    I’ll take it! Haha.

    5×2 works perfectly. I’ll try to get some photos and video up tonight if I can.

    I’ll also sign up to be there during the show Saturday and Sunday.

    #49509
    PLAYINGWITHECHOES
    Participant

    Tim, I have some 9v speed regulators and re-soldered 9v track wires. Should anything prove faulty during set up on Friday, let me know and I can bring a spare on Saturday morning for you guys to borrow on the 9v loop.

    #49510
    Bob Grier
    Participant

    Follow-up on ballasted and MILS’d track count for the updated layout:
    * LUG double straight track 32×32 – 22
    * LUG double straight track 16x32w – 2
    * LUG double track R120/R104 90-degree curves – 4
    * LUG double track standard R40 90-degree curves – 4
    * PHIL single straight track 16×32 – 69.5 used of 80 provided
    * PHIL single track standard R40 90-degree curves – 8 used of 12 provided
    * PHIL turnouts – 3 used of 4 provided

    So, we have what we need for ballasted and MILS’d track, with some of Phil’s left over if we want to modify any of the loops.

    • This reply was modified 1 year, 10 months ago by Bob Grier.
    #49511
    Bob Grier
    Participant

    Tim, I have some 9v speed regulators and re-soldered 9v track wires. Should anything prove faulty during set up on Friday, let me know and I can bring a spare on Saturday morning for you guys to borrow on the 9v loop.


    @playingwithechoes
    , please bring them, including the power supply cables if you have them. The current layout shows (4) 9v loops, and we currently only have (3) sets of speed regulators/connecting wires/power supplies coming. @jupdyke has some of the LUG’s connecting wires for repairs, but we don’t know whether he’s had a chance to do that yet. Thanks!

    • This reply was modified 1 year, 10 months ago by Bob Grier.
    #49518
    Tim
    Moderator

    Total footprint would be 2 x 5-6 baseplates

    Will you be able to bring that on Friday afternoon? If so, great. If not, no problem – we’ll just leave the allocated space empty so you can drop it in on Saturday morning. Having a trolley run will be extra awesome for this event.

    #49519
    John S
    Participant

    Hey Tim. I was just going to ask about logistics. I’m not sure if I can get there Friday due to work. If I can’t bring it until Saturday beforehand will I still be able to use loading area or need to enter through main entrance. Don’t know if you know the answer to that.

    First time doing anything there. Do I need to pay to enter or need a pass? Or is my badge my entrance pass?

    #49520
    PLAYINGWITHECHOES
    Participant

    @rcgrier3406, Ten four.

    #49525
    Will McDine
    Participant

    I still have my small town loop if needed for this event. Just let me know. I can bring it to who ever on Thursday

    #49544
    Bob Grier
    Participant

    I still have my small town loop if needed for this event. Just let me know. I can bring it to who ever on Thursday

    Two questions @willmcdine:
    * How big is it? If it’s what you had at BrickFest Live, I don’t think we have room for all of it.

    * Are you able to bring it to the Science Center either Friday afternoon from 1-5 pm, or Saturday morning from 9-10 am, and then be there for teardown Sunday after 4 pm? I know both Tim and my cars are pretty full already with all the LUG MILS’d stuff.

    #49553
    Mitch
    Participant

    Hi all I also have a train I would love to add to the display, I have been loosely following this thread but have been busy. would It be possible to get my train added? I can post pictures if that’s helpful, I would love to have it even just stationary and getting loaded up, as it’s a cargo train.

    #49567
    Bob Grier
    Participant

    Hi all I also have a train I would love to add to the display, I have been loosely following this thread but have been busy. would It be possible to get my train added? I can post pictures if that’s helpful, I would love to have it even just stationary and getting loaded up, as it’s a cargo train.

    Sure @mitchsbricks. Is it 9v, RC or just stationary? In any event, we can certainly add it to the display! Pictures are always helpful!

    #49568
    Glenn Holland
    Participant

    Apologies if this has been asked/answered already:

    For getting in Saturday morning, will we be able to use the service elevator? My train boxes are large. An elevator would be helpful that morning.

    I assume we can just say “I’m here to set up for the Locomotion event” and that will get us past having to pay admission?


    @timf
    , is it possible to have an extra table for display/train maintenance?

    #49569
    PLAYINGWITHECHOES
    Participant

    I don’t know if the LUG badges will bypass having to pay admission, but I can’t see why not since we’re there as staff, not visitors. Maybe Josh or Tim can confirm.

    I know I’m a museum member and can get my brother in as a 1+ on my member card as we plan to visit a few exhibits after our Saturday shift ends. So if admission is required for the LUG, then perhaps buddy up with anyone else in the LUG that is a member with guest privileges. I know the family plan can have to four on one card holder.

    #49571
    Mitch
    Participant

    it is rc and I attached a picture on tracks to give a sense of size. the cargo will likely be different or at least adjusted a little bit because I got some new pieces that will work better.

    Attachments:
    You must be logged in to view attached files.
    #49573
    Bob Grier
    Participant

    Speaking of pictures, here’s what I’m bringing:
    * Motorized Incline (battery operated Move Hub, motor and Pybricks program)
    * PA themed custom train (steam loco, tender, 2 passenger cars and caboose) – 9v
    * Mr. Rogers Trolley – 9v
    * Accessories: (2) train stations, crossover, water tower, hand car, crossing signals.

    • This reply was modified 1 year, 10 months ago by Bob Grier.
    Attachments:
    You must be logged in to view attached files.
    #49576
    Tim
    Moderator

    If I can’t bring it until Saturday beforehand will I still be able to use loading area or need to enter through main entrance. Don’t know if you know the answer to that.

    First time doing anything there. Do I need to pay to enter or need a pass? Or is my badge my entrance pass?

    For getting in Saturday morning, will we be able to use the service elevator? My train boxes are large. An elevator would be helpful that morning.

    I assume we can just say “I’m here to set up for the Locomotion event” and that will get us past having to pay admission?

    is it possible to have an extra table for display/train maintenance?

    Loading in on Friday is through the loading dock. I do not know whether the loading dock will be available on Saturday or not. You can go to the loading dock and buzz the staff; hopefully they will let you in.

    I’ve asked for additional table availability.

    No one should need to pay to get in. I’m waiting for an answer as to whether they will provide badges/passes or we just tell them we are staffing the display. As a general rule, wear your LUG name badge (if you have one) and a LUG shirt (again if you have one). That usually will get you in. I will update this once I hear back from Nicole. Thank you.

    **NEW INFORMATION** We can get into the event hall as early as 7:00 am on Saturday and 8:00 am on Sunday for set up. I plan to be there around 9:00 am on Saturday morning.

    #49577
    Tim
    Moderator

    it is rc and I attached a picture on tracks to give a sense of size. the cargo will likely be different or at least adjusted a little bit because I got some new pieces that will work better.

    @mitchsbricks yes please bring the train – looks great!

    #49586
    Bob Grier
    Participant

    Just to clarify, load in on Friday is thru the PointView Hall Loading dock, which is on the Heinz Field side of the building. It’s not shown on the attached Parking Directions, but it’s the road just past the Main Entrance circle.

    On Saturday, Nicole’s instructions say that early entry has to be thru the Security Entrance, which is the red double door on the Casino side of the building. There is also a loading dock there, but we’ll have to verify its availability for Saturday.

    Attachments:
    You must be logged in to view attached files.
    #49610
    Krista K
    Moderator

    There’s a chance I may pop down on Sunday to staff, photograph and generally hang out to learn more about trains. A big thanks to @timf, @rcgrier3406, and all of you train folks for taking this one and running with it. It sounds like it’s going to be an awesome display!

    #49615
    Will McDine
    Participant

    * How big is it? If it’s what you had at BrickFest Live, I don’t think we have room for all of it.

    it is the Loop I had at Brickfest Live. If there is no room for it I completely Understand, I just have it and figured if the group needed it and could use it I would volunteer it. As far as transport I could more than likely get it there on Friday around 1. Getting it home Sunday evening would be a bit difficult for me. I do have a few things planned Sunday before I go into work so I might pop down in the evening if I can. Chances are not exactly likely though.

Viewing 25 posts - 101 through 125 (of 181 total)
  • You must be logged in to reply to this topic.
Skip to toolbar