what the heck is Greg doing?

Home › Forums › All Things LEGO! › what the heck is Greg doing?

Viewing 8 posts - 451 through 458 (of 458 total)
  • Author
    Posts
  • #68111
    Tom Frost
    Participant

    it still needs something for the landing pad.

    CS Ornament Instructions

    #68178
    Greg Schubert
    Participant

    fond memory from six years ago, a project that was planned using paper with “1x plates on side” grid

    Attachments:
    You must be logged in to view attached files.
    #69244
    Greg Schubert
    Participant

    I went to an art museum and I saw a lenticular, a Robert Indiana sculpture and a Monet. I could have just gone to the LEGO store. Well, at least they had a Picasso.

    Attachments:
    You must be logged in to view attached files.
    #69250
    Greg Schubert
    Participant

    @tfdesigns, sometimes graphic designers feel obligated to mess with people’s minds.

    Attachments:
    You must be logged in to view attached files.
    #73037
    Greg Schubert
    Participant

    Currently working on the winter display for Allison Park B&M. The only place that I had enough room left to flesh out a display that is 5 feet wide and 9 feet long is the garage floor. 😜 The gray and green baseplates are placeholders for buildings that I preferred not to move.

    Attachments:
    You must be logged in to view attached files.
    #73059
    Tim
    Moderator

    That looks really nice! Looking forward to seeing it completed.

    #73060
    Benjamin C Good
    Participant
    +3

    I’m looking forward to seeing it completed also. Your garage must be way cleaner than mine.

    #73063
    Greg Schubert
    Participant

    That looks really nice! Looking forward to seeing it completed.

    Thanks Tim, it still needs lot of trees and probably hard to reach people. 🙂 Also I will add the full track, Christmas train, a 9V speed controller/power supply and hopefully a mechanism that energizes the train “on demand.”

    I had some more ambitious ideas, but since its my first winter village run at B&M, I am trying to keep it basic. Perhaps next year we can include your Santa HQ with the Heinz factory motif.

    I’m looking forward to seeing it completed also. Your garage must be way cleaner than mine.

    Yes, the display should be up and running well before the Dec 5th Q4 meeting at the store. As for cleanliness, I put a clean tarp down first, the setup was only complete for a few days and I flipped empty baseplates upside down so that they would not collect dust. Everything is back in boxes now. 📦

Viewing 8 posts - 451 through 458 (of 458 total)
  • You must be logged in to reply to this topic.

Online Now

No members are currently shown as online.